The best Side of site acceptance testing
This features assessments like stress tests for plumbing or load tests for structural factors to verify operational calls for are met. Testing happens at a variety of design stages, systematically pinpointing and rectifying possible issues early.It's not the only time task coordination wasn’t completed in between the GC and their subcontractors.